GT:Load Plan Window Settings

From coolearthwiki
Revision as of 20:38, 3 May 2006 by 64.122.111.148 (Talk)

Jump to: navigation, search

Window SEttings (Ctrl-L)

Confirm Success - checkbox
Default to On. This will put up a message when the load plan has successfully completed.
Allow multiple shipments - checkbox
Allow the load to be shipped more than once.
Collect stop numbers - checkbox
When this option is turned on, the Change Stop field will display on the screen.
Auto-schedule - checkbox
When this option is turned on, the load will automatically be scheduled, if it isn't already scheduled.
Collect Bin - checkbox
Default to On. When this option is turned on, the Bin field will be available.