GT:Multi Move

From coolearthwiki
Revision as of 13:15, 14 November 2005 by 64.122.111.148 (Talk)

(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to: navigation, search

Multi-Move

The Multi-Move window is used to simultaneously move multiple pallets at a single time. It works by individually selecting the pallets the user wishes to move and placing them on a list. Once the user is satisfied with the list, the destination bin is input and the moves are committed.

How to add a pallet to the list : The Track # field at the top of the window is available for scan or typed entry of the desired pallet to be added to the list. The list in maintained in a box which resides in the middle of the screen. This box shows approximately 5-6 pallets at a time using a scroll-bar to maneuver through them. This box maintains the column number, or position of the pallet in the list. It also maintains the pallet number, its corresponding bin and the status of the pallet.




How to remove a pallet from the list : Should the user choose to remove a pallet on the list, the user simply highlights the desired pallet using the arrow keys. The user then tabs off the box to the <Remove> button and presses enter to activate the removal function. This will remove the highlighted pallet from the list.


How to specify the destination bin : The user can scan or enter the destination bin name into the bin field at any time. This will be the location to where each pallet on the list will be placed when the transaction is completed.


Repeat Move option : There is a “Repeat Move” checkbox available for the user to specify. Should the user choose this option, subsequent multi-moves will be to the same destination bin each time until this is cleared. This checkbox is only available is set from the window settings for this screen.




Committing the Multi-Move transaction : When the user is content with the list of pallets to be moved simultaneously to the destination bin, the user may tab down to the <Move> button and commit the multi-move. A prompt-before-move box may appear depending on the screen settings made by the user.



Success Message : A success box b the transaction may also appear depending on the screen settings for Multi-Move.


Screen Settings : Allow R-bin moves - checkbox. This setting, when checked, will allow the user to move pallets which are situated in an R-bin. An R-bin is a “receiving”-bin, which is a temporary bin created for the receipt of incoming inventory until which time the receipt is committed. Prompt Before Move - checkbox. This setting turns on or off an “are you sure” pop-up window before committing the transaction when pressing <Move>. Confirm Success - checkbox. This setting turns on or off the display of a successful multi-move. Show Repeat Move Checkbox - checkbox. This setting turns on or off the display of the “Repeat Move” checkbox on the multi-move screen. Turning this setting off will remove the option from availability to the user. Case Move The case move screen is used for simply transferring a catchweighted case from one container to another.