Difference between revisions of "GT:Put Tasks"
Line 1: | Line 1: | ||
− | + | ||
+ | Put Away | ||
+ | Receiving and ‘putaway’ personnel use the ‘Putaway’ screen to place containers in strategic locations throughout a warehouse. Putaway can be accessed directly from the main menu, the production menu, or (as in our case) from the “Report Production” screen. | ||
+ | |||
+ | In the following example Putaway has been accessed from the Report Production screen. Whistle will load the appropriate Track #, Item #, description, and calculate the preferred Bin into which the container should be placed. Whistle selects the preferred Bins based on logic that considers the container’s Item #, Pull Date, and preferred zone locations. Whistle allows Bins to contain mixed Lot #s. | ||
+ | |||
+ | Once Whistle calculates the preferred Bin, the cursor rests on the “Actual Bin” field waiting for the user to enter the destination Bin tag. | ||
+ | |||
+ | |||
+ | |||
+ | ==To ‘Putaway’ containers== | ||
+ | Enter the Bin # of the bin where you will place the container. | ||
+ | |||
+ | |||
+ | While it is recommended that you place the container in the recommended location, you may enter a Bin # different from the one suggested. In this example a Bin different from the one suggested was selected. | ||
+ | Whistle will check the selected Bin for availability. Whistle may not allow you to place the container in a particular Bin for several reasons: | ||
+ | |||
+ | |||
+ | The Bin is full | ||
+ | The Bin is too short | ||
+ | The Bin is too narrow | ||
+ | Bin is locked or on hold | ||
+ | |||
+ | |||
+ | If Whistle displays an error message, select another Bin. If the Bin you select is compatible but different than the one suggested, Whistle will ask you to confirm that the Bin you entered differed from the preferred Bin. If you entered the Bin number in error, Whistle now allows you to reenter the Bin # again. | ||
+ | |||
+ | Whistle will display the Warning as well as other message pop-ups depending on the screen setting for the Put Away window. | ||
+ | Press <Cancel> to enter a new Bin # or <OK> to verify the different Bin. | ||
+ | Select <Move> to complete the PutAway transaction. Select <Back> to cancel the transaction. | ||
+ | |||
+ | |||
+ | Once you have responded to the previous message, select <OK> to enter the information. | ||
+ | To continue with ‘Report Production’: | ||
+ | Once Put Away is complete, Whistle returns to the Report Production screen ready to report production of another container of the same item (this assumes that you accessed the Putaway screen from the Report Production screen). If you accessed the Putaway screen directly from either the main menu or production menu, Whistle will simply revert to a blank putaway screen and await you to enter another track #. | ||
+ | |||
+ | |||
+ | Notice that production line #1 shows that 7 containers have been produced. Also notice that this production order calls for the production of 19 full containers ( “# Reported” line). | ||
+ | |||
+ | |||
+ | |||
+ | Select <OK> by pressing the “Enter” key. | ||
+ | |||
+ | Whistle will ask you to confirm that you want to build the container. Check to see that the Lot # and Pull Date are correct for the item(s) being produced. Change these fields as necessary. Whistle automatically reverts to reporting production of a full container. You may override this feature by: | ||
+ | |||
+ | |||
+ | Entering a new quantity in the “Quantity” field. | ||
+ | Entering a new quantity in the ‘Boxes’ and ‘Layers’ fields | ||
+ | |||
+ | |||
+ | |||
+ | Select <YES> again. | ||
+ | |||
+ | |||
+ | Whistle will generate a new tracking number. If you need to report production of a different item, press F2 (FUNC 2) or F3 to switch between production lines without changing production line number one. Notice Whistle displays a full container quantity of the item in question. | ||
+ | |||
+ | Whistle will skip the Putaway screen unless you have the [Putaway] checkbox marked. With the checkbox on, Whistle will automatically take the user to the Putaway window. Select <OK> if you would like to putaway immediately. Select <Cancel> if you would like to continue reporting production., leaving the newly reported pallet in the PRODSTAGE bin. |
Latest revision as of 17:33, 4 January 2006
Put Away Receiving and ‘putaway’ personnel use the ‘Putaway’ screen to place containers in strategic locations throughout a warehouse. Putaway can be accessed directly from the main menu, the production menu, or (as in our case) from the “Report Production” screen.
In the following example Putaway has been accessed from the Report Production screen. Whistle will load the appropriate Track #, Item #, description, and calculate the preferred Bin into which the container should be placed. Whistle selects the preferred Bins based on logic that considers the container’s Item #, Pull Date, and preferred zone locations. Whistle allows Bins to contain mixed Lot #s.
Once Whistle calculates the preferred Bin, the cursor rests on the “Actual Bin” field waiting for the user to enter the destination Bin tag.
To ‘Putaway’ containers
Enter the Bin # of the bin where you will place the container.
While it is recommended that you place the container in the recommended location, you may enter a Bin # different from the one suggested. In this example a Bin different from the one suggested was selected.
Whistle will check the selected Bin for availability. Whistle may not allow you to place the container in a particular Bin for several reasons:
The Bin is full
The Bin is too short
The Bin is too narrow
Bin is locked or on hold
If Whistle displays an error message, select another Bin. If the Bin you select is compatible but different than the one suggested, Whistle will ask you to confirm that the Bin you entered differed from the preferred Bin. If you entered the Bin number in error, Whistle now allows you to reenter the Bin # again.
Whistle will display the Warning as well as other message pop-ups depending on the screen setting for the Put Away window. Press <Cancel> to enter a new Bin # or <OK> to verify the different Bin. Select <Move> to complete the PutAway transaction. Select <Back> to cancel the transaction.
Once you have responded to the previous message, select <OK> to enter the information.
To continue with ‘Report Production’:
Once Put Away is complete, Whistle returns to the Report Production screen ready to report production of another container of the same item (this assumes that you accessed the Putaway screen from the Report Production screen). If you accessed the Putaway screen directly from either the main menu or production menu, Whistle will simply revert to a blank putaway screen and await you to enter another track #.
Notice that production line #1 shows that 7 containers have been produced. Also notice that this production order calls for the production of 19 full containers ( “# Reported” line).
Select <OK> by pressing the “Enter” key.
Whistle will ask you to confirm that you want to build the container. Check to see that the Lot # and Pull Date are correct for the item(s) being produced. Change these fields as necessary. Whistle automatically reverts to reporting production of a full container. You may override this feature by:
Entering a new quantity in the “Quantity” field.
Entering a new quantity in the ‘Boxes’ and ‘Layers’ fields
Select <YES> again.
Whistle will generate a new tracking number. If you need to report production of a different item, press F2 (FUNC 2) or F3 to switch between production lines without changing production line number one. Notice Whistle displays a full container quantity of the item in question.
Whistle will skip the Putaway screen unless you have the [Putaway] checkbox marked. With the checkbox on, Whistle will automatically take the user to the Putaway window. Select <OK> if you would like to putaway immediately. Select <Cancel> if you would like to continue reporting production., leaving the newly reported pallet in the PRODSTAGE bin.