Difference between revisions of "GS:Update Pallet"

From coolearthwiki
Jump to: navigation, search
Line 3: Line 3:
 
==How to Update a Pallet==  
 
==How to Update a Pallet==  
 
The user should arrow or tab down onto the '''Track''' field.  This field will take a container pallet number.  Enter a pallet number, or use the "Ctrl" and "A" keys to go to the [[GS:Find Inventory|Find Inventory]] screen to get a list of pallets to choose from, or scan the pallet label.
 
The user should arrow or tab down onto the '''Track''' field.  This field will take a container pallet number.  Enter a pallet number, or use the "Ctrl" and "A" keys to go to the [[GS:Find Inventory|Find Inventory]] screen to get a list of pallets to choose from, or scan the pallet label.
 +
  
 
[[Image:UpdatePallet1.gif|500px|Image:UpdatePallet1.gif|500px]]
 
[[Image:UpdatePallet1.gif|500px|Image:UpdatePallet1.gif|500px]]
  
  
Once a pallet number has been entered from either a scanner or keyboard, the specific inventory on the pallet may be selected using the A-Z keys.
+
Once a pallet number has been entered, the specific inventory to be updated on the pallet may be selected using the "A" and "Z" keys to scroll through the inventory.
  
 
[[Image:UpdatePallet2.gif|500px|Image:UpdatePallet2.gif|500px]]
 
[[Image:UpdatePallet2.gif|500px|Image:UpdatePallet2.gif|500px]]
  
After filling the inventory, the user should tab or down arrow into the New Information section.  Various fields will be available for updating.  The user can enter in any new values desired in the appropriate fields.
+
After finding the inventory, the user should tab or down arrow into the '''New Information''' section.  Various fields will be available for updating.  The user can enter in any new values desired in the appropriate fields.
  
Once the changes have been entered, the user can then tab down to the <OK> button.  Pressing <ENTER> will start the transaction, and you will be prompted with a confirmation message box (depending on your screen settings).
+
Once the changes have been entered, the user can then tab or use the arrow keys to move down to the "<OK>" button.  Pressing "ENTER" will start the transaction, and you will be prompted with a confirmation message box (depending on your screen settings).
  
  
Pressing <ENTER> will commit the transaction and you will be returned a success message box upon completion.  The message box will specify which fields were changed.  In the example below, the pull date field was changed.
+
Pressing "ENTER" will commit the transaction and you will be returned a success message box upon completion.  The message box will specify which fields were changed.  In the example below, the pull date field was changed.
  
 
[[Image:UpdatePallet3.gif|500px|Image:UpdatePallet3.gif|500px]]
 
[[Image:UpdatePallet3.gif|500px|Image:UpdatePallet3.gif|500px]]

Revision as of 16:20, 16 June 2006

This Whistle screen is used to update the information about a pallet. Various fields are available for update, including, among others, Pull Date, Prod Date, and Lot.

How to Update a Pallet

The user should arrow or tab down onto the Track field. This field will take a container pallet number. Enter a pallet number, or use the "Ctrl" and "A" keys to go to the Find Inventory screen to get a list of pallets to choose from, or scan the pallet label.


Image:UpdatePallet1.gif


Once a pallet number has been entered, the specific inventory to be updated on the pallet may be selected using the "A" and "Z" keys to scroll through the inventory.

Image:UpdatePallet2.gif

After finding the inventory, the user should tab or down arrow into the New Information section. Various fields will be available for updating. The user can enter in any new values desired in the appropriate fields.

Once the changes have been entered, the user can then tab or use the arrow keys to move down to the "<OK>" button. Pressing "ENTER" will start the transaction, and you will be prompted with a confirmation message box (depending on your screen settings).


Pressing "ENTER" will commit the transaction and you will be returned a success message box upon completion. The message box will specify which fields were changed. In the example below, the pull date field was changed.

Image:UpdatePallet3.gif


Update Pallet Window Settings