Difference between revisions of "GX:Load Plan Window Settings"

From coolearthwiki
Jump to: navigation, search
 
Line 1: Line 1:
mapSetting("Prompt Before Return", CHECKBOX, "1");
+
==Window SEttings (Ctrl-L)==
mapSetting("Confirm Success", CHECKBOX, "1");
+
;Confirm Success - checkbox:  Default to On.  This will put up a message when the load plan has successfully completed.
mapSetting("Allow multiple shipments",CHECKBOX,"0");
+
;Allow multiple shipments - checkbox:  Allow the load to be shipped more than once.
mapSetting("Collect stop numbers", CHECKBOX, "0");
+
;Collect stop numbers - checkbox:  When this option is turned on, the Change Stop field will display on the screen.
mapSetting("Auto-schedule",CHECKBOX,"0");
+
;Auto-schedule - checkbox:  When this option is turned on, the load will automatically be scheduled, if it isn't already scheduled.
mapSetting("Collect Bin", CHECKBOX, "1");
+
;Collect Bin - checkbox:  Default to On.  When this option is turned on, the Bin field will be available.

Revision as of 19:38, 3 May 2006

Window SEttings (Ctrl-L)

Confirm Success - checkbox
Default to On. This will put up a message when the load plan has successfully completed.
Allow multiple shipments - checkbox
Allow the load to be shipped more than once.
Collect stop numbers - checkbox
When this option is turned on, the Change Stop field will display on the screen.
Auto-schedule - checkbox
When this option is turned on, the load will automatically be scheduled, if it isn't already scheduled.
Collect Bin - checkbox
Default to On. When this option is turned on, the Bin field will be available.