Difference between revisions of "GS:Production Menu"

From coolearthwiki
Jump to: navigation, search
 
(37 intermediate revisions by 4 users not shown)
Line 1: Line 1:
[[Image:prodMenu.JPG|thumbnail|500px|Production Menu|Image:prodMenu.JPG|thumbnail|500px|Production Menu]]
+
The Production Menu contains the functionality needed for production, or reporting production.
The Production Menu has these functions :
+
*[[GS:Report Prod|Report Prod]]
+
*[[GS:Setup Item|Setup Item]]
+
*[[GS:Stage Ingredients|Stage Ingredients]]
+
*[[GS:Stage Wave|Stage Wave]]
+
*[[GS:Prod Issue|Prod Issue]]
+
*[[GS:Item Issue|Item Issue]]
+
*[[GS:Fresh Pack|Fresh Pack]]
+
*[[GS:Module Build|Module Build]]
+
*[[GS:Picking|Picking]]
+
*[[GS:Put Tasks|Put Tasks]]
+
*[[GS:Issuing Materials to Production|Issuing Materials to Production]]
+
  
=Report Production Menu Options=
+
[[Image:ProdMenu2.gif|500px|Image:ProdMenu2.gif|500px]]
  
Report Prod - Report all items coming off a production line
+
*[[GS:Report Production Window|Report Production Window]] Report all items coming off a production line.
Stage - Stage inventory for production reporting and issuing. (2 available)
+
*[[GS:Unreport Pallet Window|Unreport Pallet Window]] Unreport a pallet previously produced.
Prod Issue production ‘ingredients’ to the production line
+
*[[GS:Report Outsourced Window|Report Outsourced Window]] Report production that was done at an outside plant.
Case Report - Case reporting of catchweighted inventory.
+
*[[GS:Setup Item Window|Setup Item Window]] Set up the information for a new Item.
Module Build - Create a new “item” out of several other items.
+
*[[GS:Stage Ingredients Window|Stage Ingredients Window]] Stage inventory for production reporting and issuing.
Picking - Decide where they are going to pick items within a warehouse
+
*[[GS:Stage Wave Window|Stage Wave Window]] Stage inventory for production reporting and issuing.
Put Tasks - Decide where containers are to be put away
+
*[[GS:Production Issue Window|Production Issue Window]] Issue production ‘ingredients’ to the production line.
 +
*[[GS:Case Report Window|Case Report Window]] Case reporting of catchweighted inventory.
 +
*[[GS:Item Issue Window|Item Issue Window]] Issue ‘ingredients’ to the production line, but not to a specific order.
 +
*[[GS:Misc Production Report Window|Misc Production Report Window]] Issue miscellaneous production.
 +
*[[GS:Module Build Window|Module Build Window]] Create a new “item” out of several other items.
 +
*[[GS:Picking Window|Picking Window]] Decide where they are going to pick items within a warehouse.
 +
*[[GS:Put Tasks Window|Put Tasks Window]] Decide where containers are to be put away.
 +
*[[GS:Print Ticket Window|Print Ticket Window]] Print a label for the indicated pallet (available here in Ultra mode only).
 +
*[[GS:Print Production Summary Window|Print Production Summary Window]] Print a report of the production for a given date (available here in Ultra mode only).
 +
*[[GS:Print Transaction History Window|Print Transaction History Window]] Print a report transaction log for a given date (available here in Ultra mode only).
 +
*[[GS:Palletize Cases Window|Palletize Cases Window]]
 +
*[[GS:Palletize Co-Packed Window|Palletize Co-Packed Window]]
 +
*[[GS:Palletize Flow|Palletize Flow]]
  
==Menu Settings==
+
To return to the Main menu, highlight the "<Back>" button and press "Enter", or press the "Esc" key.
These menu options, as in all Whistle menus, are optional.  By accessing the window settings of the Production menu, a user can toggle the display of the menu options listed above.
+
  
Included in the Menu Settings are the following:
+
==How to choose a menu option:==
Zone Filter 1, ZF1 (Zone Filter 1) Alias.
+
Either highlight the desired function and press ‘Enter’ or simply enter the number of the option you wish to choose. Whistle will bring you to the appropriate screen.
Zone Filter 2, ZF2 (Zone Filder 2) Alias.
+
  
Zone Filter 1 and its alias will be used for the first Stage menu option.
+
==[[GS:Production Menu Settings|Production Menu Settings]]==
Zone Filter 2 and its alias will be used for the second Stage menu option.
+
 
+
 
+
Put Away
+
Receiving and ‘putaway’ personnel use the ‘Putaway’ screen to place containers in strategic locations throughout a warehouse.  Putaway can be accessed directly from the main menu, the production menu, or (as in our case) from the “Report Production” screen. 
+
 
+
In the following example Putaway has been accessed from the Report Production screen.  Whistle will load the appropriate Track #, Item #, description, and calculate the preferred Bin into which the container should be placed.  Whistle selects the preferred Bins based on logic that considers the container’s Item #, Pull Date, and preferred zone locations.  Whistle allows Bins to contain mixed Lot #s. 
+
 
+
Once Whistle calculates the preferred Bin, the cursor rests on the “Actual Bin” field waiting for the user to enter the destination Bin tag.
+
 
+
 
+
 
+
To ‘Putaway’ containers:
+
Enter the Bin # of the bin where you will place the container. 
+
 
+
 
+
While it is recommended that you place the container in the recommended location, you may enter a Bin # different from the one suggested. In this example a Bin different from the one suggested was selected. 
+
 
+
 
+
 
+
 
+
 
+
 
+
 
+
 
+
 
+
 
+
Whistle will check the selected Bin for availability.  Whistle may not allow you to place the container in a particular Bin for several reasons:
+
 
+
 
+
The Bin is full
+
The Bin is too short
+
The Bin is too narrow
+
Bin is locked or on hold
+
 
+
 
+
If Whistle displays an error message, select another Bin.  If the Bin you select is compatible but different than the one suggested, Whistle will ask you to confirm that the Bin you entered differed from the preferred Bin.  If you entered the Bin number in error, Whistle now allows you to reenter the Bin # again. 
+
 
+
Whistle will display the Warning as well as other message pop-ups depending on the screen setting for the Put Away window.
+
Press <Cancel> to enter a new Bin # or <OK> to verify the different Bin. 
+
Select <Move> to complete the PutAway transaction.  Select <Back> to cancel the transaction.
+
 
+
 
+
Once you have responded to the previous message, select <OK> to enter the information. 
+
To continue with ‘Report Production’:
+
Once Put Away is complete, Whistle returns to the Report Production screen ready to report production of another container of the same item (this assumes that you accessed the Putaway screen from the Report Production screen).  If you accessed the Putaway screen directly from either the main menu or production menu, Whistle will simply revert to a blank putaway screen and await you to enter another track #.   
+
 
+
 
+
Notice that production line #1 shows that 7 containers have been produced.  Also notice that this production order calls for the production of 19 full containers  ( “# Reported”  line).
+
 
+
 
+
 
+
Select <OK> by pressing the “Enter” key. 
+
 
+
Whistle will ask you to confirm that you want to build the container.  Check to see that the Lot # and Pull Date are correct for the item(s) being produced.  Change these fields as necessary.  Whistle automatically reverts to reporting production of a full container.  You may override this feature by:
+
 
+
 
+
Entering a new quantity in the “Quantity” field.
+
Entering a new quantity in the ‘Boxes’ and ‘Layers’ fields
+
 
+
 
+
 
+
Select <YES> again.
+
 
+
 
+
Whistle will generate a new tracking number.  If you need to report production of a different item, press F2 (FUNC 2) or F3 to switch between production lines without changing production line number one.  Notice Whistle displays a full container quantity of the item in question.
+
 
+
Whistle will skip the Putaway screen unless you have the [Putaway] checkbox marked. With the checkbox on, Whistle will automatically take the user to the Putaway window.  Select <OK> if you would like to putaway immediately.  Select <Cancel> if you would like to continue reporting production., leaving the newly reported pallet in the PRODSTAGE bin.
+
 
+
 
+
 
+
Unreport Production
+
Whistle allows users to fix ‘report production’ transactions.  Sometimes data (quantity, lot #, pull date) is incorrectly entered the first time and needs to updated.  These updates are made in the Report Production screen.
+
To Unreport Production:
+
Type or select the appropriate Pack Order number.
+
 
+
 
+
Enter the appropriate tracking number of the container that you would like to update.
+
 
+
 
+
Once the pack order and tracking number are in place, adjust quantity to the appropriate number.  In this case it is “0” (zero). 
+
 
+
 
+
Whistle may display one of several messages to warn the user that they have entered an unusual number (zero in this case):
+
 
+
Entering a new quantity of ZERO may delete the pallet based on screen settings to that effect.
+
 
+
 
+
 
+
Select <YES> to proceed.  Whistle may display a similar message when scrolling through the Layers and Boxes fields.  Select <OK> to confirm the an unusual quantity entry again.
+
 
+
 
+
Fill in Lot code and Pull Date.  Select <OK>.
+
 
+
 
+
Select <OK> at the bottom of the screen.
+
 
+
 
+
Whistle will display a message to confirm that the user wants to update previously entered Report Production data should the screen settings be set for this option.
+

Latest revision as of 16:07, 23 July 2007

The Production Menu contains the functionality needed for production, or reporting production.

Image:ProdMenu2.gif

To return to the Main menu, highlight the "<Back>" button and press "Enter", or press the "Esc" key.

How to choose a menu option:

Either highlight the desired function and press ‘Enter’ or simply enter the number of the option you wish to choose. Whistle will bring you to the appropriate screen.

Production Menu Settings